MARKET Railways

MRTA Purple Line

Client: CH. Karnchang PCL, Sino-Thai Engineering & Construction PCL
Date: 2010-2012
 
Services Rendered:
» Value Engineering
» Construction Engineering
 
Redesign and construction stage checking of superstructure and substructure as follows:
Continuous span elevated viaduct supported by barrette piles 2-1x3 m.
Station barrette piles 4-1.2x3 m.
Long span bridge of 40+60+40 m
Portal frames with span of 16-40 m.
Cantilever and T-head column with pier height of 20-26 m.
Crossbeam of platform and concourse for the typical station.
Redesign of Entrance Buildings
Redesign of Tao Poon Station